Commissioning

We can deliver key-personnel such as commissioning lead engineers and our own technicians to the project. The advantage for the project regarding quality, HSE and cost-effectiveness in this strategic is terrific.

Instrument and equipment.

Norasol can offer all necessary instrument needed to execute a commissioning. Calibrated instrument and loggers needed for air balancing HVAC systems can be provided, such as manometers, anemometers and a various of sensors for measuring static pressure, dynamic pressure, temperatures, humidity and decibel. In addition, we have the equipment and experience to execute test for determining air leakage rates and test the integrity of temporary refugee and LQ´s (TR-test).

We provide the complete commissioning service including;

  • Pre-Commissioning
  • Environmental Tests
  • Sound Readings
  • Balancing and Regulation
  • Electrical Testing
  • Rapid Response Shut Down Testing
  • Pressure Regimes Airflow Direction Checks
  • Clean Room Testing
  • Temperature Mapping
  • BMS/Controls
  • Commissioning and Testing
  • TR Testing
  • LEV Testing
  • Demonstrations
  • Preparation of Detailed Reports

TR-test

PFEER, Smoke & Gas Ingress, TR, TSR Integrity Testing

In order to comply with SI 1995 No 743, The Offshore Installations (Prevention of Fire and Explosion, and Emergency Response) Regulations 1995 it is a requirement for the Offshore operator to prove compliance of all Temporary Refuges (TR) in accordance with this regulation.

PFEER defines goals for the preventive and protective measures necessary for managing fire and explosion hazards, and for emergency response. These goals allow duty holders the flexibility to develop detailed arrangements for each stage of an installation’s life cycle.

How can Norasol HVAC help you?

Specialists within Norasol HVAC company have extensive experience in the evaluation and testing of the porosity of TR’s against the infiltration of smoke, fume and noxious gas. We will conduct the required testing to meet the relevant regulations and each test is adapted to suit individual situations;

  • Definitions of TR Boundary
  • Pre-test surveys
  • Testing and Verification
  • Investigation of leakage paths
  • Thermal imaging
  • Smoke testing
  • Repairs to or replacement of modular doors
  • Repair to or upgrades of HVAC systems and components
  • Develop and provide a maintains-plan to minimize future problems
  • Hand over a full valid test-report